# Revision on a flow

**URL:** <https://connective.celigo.com/t/revision-on-a-flow/415>\
**Category:** Integrator.io\
**Tags:** flow-builder\
**Created:** [July 18, 2023, 11:17am UTC](https://connective.celigo.com/t/revision-on-a-flow/415 "2023-07-18T11:17:00Z")\
**Posts on this page:** 5\
**Page:** 1

<div class="post-metadata">

**Author:** ![hristinabendeva](https://avatars.discourse-cdn.com/v4/letter/h/97f17d/32.png) [@hristinabendeva](https://connective.celigo.com/u/hristinabendeva)\
**Post date:** [July 18, 2023, 11:17am UTC](https://connective.celigo.com/t/revision-on-a-flow/415/1 "2023-07-18T11:17:00Z")

</div>

Can I create a revision snapshot for one flow instead of the whole integration? If not is there a plan for an update like that to be released?

---

<div class="post-metadata">

**Author:** ![tylerlamparter](https://sea1.discourse-cdn.com/flex001/user_avatar/connective.celigo.com/tylerlamparter/32/9204_2.png) [@tylerlamparter](https://connective.celigo.com/u/tylerlamparter)\
**Post date:** [July 18, 2023, 1:33pm UTC](https://connective.celigo.com/t/revision-on-a-flow/415/2 "2023-07-18T13:33:01Z")

</div>

@hristinabendeva, not currently. Out of curiosity, why do you want to make a snapshot for a single flow and not just the whole integration that the flow lives in?

---

<div class="post-metadata">

**Author:** ![hristinabendeva](https://avatars.discourse-cdn.com/v4/letter/h/97f17d/32.png) [@hristinabendeva](https://connective.celigo.com/u/hristinabendeva)\
**Post date:** [July 18, 2023, 1:56pm UTC](https://connective.celigo.com/t/revision-on-a-flow/415/3 "2023-07-18T13:56:49Z")

</div>

Hi @tylerlamparter,

The reason is that if we make a change in two different flows in the same integration and we want to revert the changes in just one we cannot do that.

---

<div class="post-metadata">

**Author:** ![steveklett](https://avatars.discourse-cdn.com/v4/letter/s/e495f1/32.png) [@steveklett](https://connective.celigo.com/u/steveklett)\
**Post date:** [July 18, 2023, 4:34pm UTC](https://connective.celigo.com/t/revision-on-a-flow/415/4 "2023-07-18T16:34:07Z")

</div>

FWIW, I've had this exact scenario multiple times and wish we could version control at the flow level. I tried to clone the Integration to create separate "feature branches" but after merging in the first, I couldn't merge additional branches because the base had changed.

---

<div class="post-metadata">

**Author:** ![ravisingh](https://sea1.discourse-cdn.com/flex001/user_avatar/connective.celigo.com/ravisingh/32/6981_2.png) [@ravisingh](https://connective.celigo.com/u/ravisingh)\
**Post date:** [July 18, 2023, 5:46pm UTC](https://connective.celigo.com/t/revision-on-a-flow/415/5 "2023-07-18T17:46:23Z")

</div>

@hristinabendeva @steveklett   
One way would be to start with a clean integration and then create integration clones in which you will create separate flows. E.g. clone 1 for flow 1 and clone 2 for flow 2. This way you could do parallel development in each of the flows and when you are sure of the changes, you could pull in the flow 1 changes in the original integration without effecting flow 2. But yes, at this moment you won't be able to revert at flow level. We will review this further and then include it in the backlog.
