# Flow Schedules during Revision Pull

**URL:** <https://connective.celigo.com/t/flow-schedules-during-revision-pull/3600>\
**Category:** Integrator.io\
**Tags:** flow-builder\
**Created:** [February 28, 2025, 11:47pm UTC](https://connective.celigo.com/t/flow-schedules-during-revision-pull/3600 "2025-02-28T23:47:37Z")\
**Posts on this page:** 6\
**Page:** 1

<div class="post-metadata">

**Author:** ![davidgollom](https://sea1.discourse-cdn.com/flex001/user_avatar/connective.celigo.com/davidgollom/32/6605_2.png) [@davidgollom](https://connective.celigo.com/u/davidgollom)\
**Post date:** [February 28, 2025, 11:47pm UTC](https://connective.celigo.com/t/flow-schedules-during-revision-pull/3600/1 "2025-02-28T23:47:37Z")

</div>

Hi All,  
Not sure what I'm doing wrong here or maybe there's a bug.

I've set the flow schedule to be ignored when doing a revision pull into my production. My flows are scheduled in Prod but not in Sandbox. However, I get conflict errors when trying to do a pull and I'm stuck. Why do I have conflicts if these fields should be ignored??

Am I missing something?

 ![The image shows a code conflict in a version control system, indicating a difference in the "schedule" line between "Before pull" and "After pull" sections. (Captioned by AI)](https://us1.discourse-cdn.com/flex001/uploads/celigo/original/2X/1/155f656697c2164c511cfbf60e47e17c68df610d.png)

---

<div class="post-metadata">

**Author:** ![tylerlamparter](https://sea1.discourse-cdn.com/flex001/user_avatar/connective.celigo.com/tylerlamparter/32/9204_2.png) [@tylerlamparter](https://connective.celigo.com/u/tylerlamparter)\
**Post date:** [March 1, 2025, 5:05pm UTC](https://connective.celigo.com/t/flow-schedules-during-revision-pull/3600/2 "2025-03-01T17:05:07Z")

</div>

@praveenbasani there should be no conflict in this case, right?

@davidgollom can you share a screenshot of your ignore rule?

---

<div class="post-metadata">

**Author:** ![davidgollom](https://sea1.discourse-cdn.com/flex001/user_avatar/connective.celigo.com/davidgollom/32/6605_2.png) [@davidgollom](https://connective.celigo.com/u/davidgollom)\
**Post date:** [March 1, 2025, 10:16pm UTC](https://connective.celigo.com/t/flow-schedules-during-revision-pull/3600/3 "2025-03-01T22:16:14Z")

</div>

Hey Tyler.  
Here you go.

 ![This image shows a settings interface where users can select fields to be ignored during a data pull, with some fields under "flow" already selected such as "disabled," "schedule," and "timezone." (Captioned by AI)](https://us1.discourse-cdn.com/flex001/uploads/celigo/original/2X/e/e716a35d37ffc2dae7a3b0935b32e023dced2fb4.png)

---

<div class="post-metadata">

**Author:** ![davidgollom](https://sea1.discourse-cdn.com/flex001/user_avatar/connective.celigo.com/davidgollom/32/6605_2.png) [@davidgollom](https://connective.celigo.com/u/davidgollom)\
**Post date:** [March 1, 2025, 10:17pm UTC](https://connective.celigo.com/t/flow-schedules-during-revision-pull/3600/4 "2025-03-01T22:17:58Z")

</div>

Also, I did find a sort of work around. If I changed the source schedule from null to anything the conflict went away. Seems like maybe a bug exists when the source is missing the ignore rule doesn't work correctly.

---

<div class="post-metadata">

**Author:** ![praveenbasani](https://sea1.discourse-cdn.com/flex001/user_avatar/connective.celigo.com/praveenbasani/32/9585_2.png) [@praveenbasani](https://connective.celigo.com/u/praveenbasani)\
**Post date:** [March 3, 2025, 12:05pm UTC](https://connective.celigo.com/t/flow-schedules-during-revision-pull/3600/5 "2025-03-03T12:05:09Z")

</div>

@davidgollom can you show us the details (a screenshot) you see under 'conflicts' section there in the first image you shared?

---

<div class="post-metadata">

**Author:** ![davidgollom](https://sea1.discourse-cdn.com/flex001/user_avatar/connective.celigo.com/davidgollom/32/6605_2.png) [@davidgollom](https://connective.celigo.com/u/davidgollom)\
**Post date:** [March 7, 2025, 1:08am UTC](https://connective.celigo.com/t/flow-schedules-during-revision-pull/3600/6 "2025-03-07T01:08:23Z")

</div>

Hi - Just catching up here.  
I just got the updated version of Celigo. The old problem went away but now there's a new one. I'm ignoring the Schedule but the pull is trying to overwrite my production schedule with the null schedule from Sandbox.  
Here are the rules:

 ![The image shows a settings panel titled "Ignore fields during pull," where specific fields like "flow.disabled," "flow.schedule," and "flow.timezone" are selected to be ignored during a pull operation. (Captioned by AI)](https://us1.discourse-cdn.com/flex001/uploads/celigo/original/2X/7/761d5de1794138638eacc1d901ec37ac6cb7c93e.png)  
And here's the proposed update:  
 ![The image shows a version control interface highlighting changes before and after a pull, with modifications in JSON code related to "Get NetSuite items" and "Flows," including updates to names and schedule settings. (Captioned by AI)](https://us1.discourse-cdn.com/flex001/uploads/celigo/original/2X/0/0984ecba6382f977e0dbd118cc6e3e4049ac7808.png)

This should be getting ignored.
