# B2B Manager for EDI

**URL:** https://connective.celigo.com/c/b2b-manager/10.md

[Latest](https://connective.celigo.com/latest.md) · [Categories](https://connective.celigo.com/categories.md) · [Tags](https://connective.celigo.com/tags.md)

---

## [About the B2B Manager for EDI category](https://connective.celigo.com/t/about-the-b2b-manager-for-edi-category/44)

<div class="topic-metadata">

**Author:** [@tylerlamparter](https://connective.celigo.com/u/tylerlamparter)\
**Replies:** 0\
**Last updated:** [August 21, 2024, 1:34am UTC](https://connective.celigo.com/t/about-the-b2b-manager-for-edi-category/44 "2024-08-21T01:34:49Z")

</div>

Discuss best practices, troubleshoot, and optimize EDI transactions in Celigo B2B Manager.

---

## [Can't clone Integration created before upgrade to B2B Mgr](https://connective.celigo.com/t/cant-clone-integration-created-before-upgrade-to-b2b-mgr/6492)

<div class="topic-metadata">

**Author:** [@steveklett](https://connective.celigo.com/u/steveklett)\
**Replies:** 4\
**Last updated:** [September 25, 2026, 10:59am UTC](https://connective.celigo.com/t/cant-clone-integration-created-before-upgrade-to-b2b-mgr/6492 "2026-09-25T10:59:46Z")

</div>

I'm trying to clone an Integration from production that was created before we enabled B2B Manager. During the final step of Installation of the cloned integration I receive the error: Global ID is required in the file …

---

## [Options to use one Flow for multiple trading partners](https://connective.celigo.com/t/options-to-use-one-flow-for-multiple-trading-partners/6485)

<div class="topic-metadata">

**Author:** [@steveklett](https://connective.celigo.com/u/steveklett)\
**Replies:** 2\
**Last updated:** [September 22, 2026, 3:12am UTC](https://connective.celigo.com/t/options-to-use-one-flow-for-multiple-trading-partners/6485 "2026-09-22T03:12:41Z")

</div>

I'm building an integration that has exceptionally simple EDI requirements with a very limited scope of options and values that will be supported. For example, no pricing data, no addresses, 3 trade skus, 2 shipping meth…

---

## [850 Send Document Not on EDI Dashboard](https://connective.celigo.com/t/850-send-document-not-on-edi-dashboard/6370)

<div class="topic-metadata">

**Author:** [@davidgollom](https://connective.celigo.com/u/davidgollom)\
**Replies:** 3\
**Last updated:** [July 7, 2026, 10:24am UTC](https://connective.celigo.com/t/850-send-document-not-on-edi-dashboard/6370 "2026-07-07T10:24:45Z")

</div>

Hi, I just launched a new trading partner any the 850 documents I'm sending are not showing up in the EDI dashboard. Is there possibly something in my file generation rules that's preventing it from showing up? The E…

---

## [Generate Multiple Files from Records in a Page](https://connective.celigo.com/t/generate-multiple-files-from-records-in-a-page/6362)

<div class="topic-metadata">

**Author:** [@davidgollom](https://connective.celigo.com/u/davidgollom)\
**Replies:** 3\
**Last updated:** [June 26, 2026, 7:34am UTC](https://connective.celigo.com/t/generate-multiple-files-from-records-in-a-page/6362 "2026-06-26T07:34:45Z")

</div>

Hi Everyone, I'm working on a project where we need to send 2 years worth of X12 852 Activity data. The data is sourced from NetSuite and needs to be grouped by weeks. I've got a presave page script creating records …

---

## [Internal Mongodb Error in EDI Export](https://connective.celigo.com/t/internal-mongodb-error-in-edi-export/6157)

<div class="topic-metadata">

**Author:** [@davidgollom](https://connective.celigo.com/u/davidgollom)\
**Replies:** 5\
**Last updated:** [March 27, 2026, 4:32pm UTC](https://connective.celigo.com/t/internal-mongodb-error-in-edi-export/6157 "2026-03-27T16:32:19Z")

</div>

Hi Everyone, I’m receiving this error message when trying to send an 870 document via FTP to DSCO. Message: Could not save EDI transactions to database: EdiTransaction validation failed: documentType: 870 is not a val…

---

## [What to do before starting a B2B Manager integration](https://connective.celigo.com/t/what-to-do-before-starting-a-b2b-manager-integration/6131)

<div class="topic-metadata">

**Author:** [@andysample](https://connective.celigo.com/u/andysample)\
**Replies:** 0\
**Last updated:** [March 16, 2026, 4:24pm UTC](https://connective.celigo.com/t/what-to-do-before-starting-a-b2b-manager-integration/6131 "2026-03-16T16:24:52Z")

</div>

The B2B Manager toolset in integrator.io allows you to quickly automate and standardize your B2B processes using EDI format documents while using the powerful flow building and error management tools in the Integrator.io …

---

## [Issue with Duplicated EDI Control Numbers](https://connective.celigo.com/t/issue-with-duplicated-edi-control-numbers/6109)

<div class="topic-metadata">

**Author:** [@Eric\_Buckley](https://connective.celigo.com/u/Eric_Buckley)\
**Replies:** 3\
**Last updated:** [March 10, 2026, 2:00pm UTC](https://connective.celigo.com/t/issue-with-duplicated-edi-control-numbers/6109 "2026-03-10T14:00:20Z")

</div>

I am running into an issue with my outbound EDI flow in B2B manager when my flow run processes more than one page. I have a netsuite saved search that is pulling warehouse orders that I need to send out as 943s, however …

---

## [Verification Failed](https://connective.celigo.com/t/verification-failed/6098)

<div class="topic-metadata">

**Author:** [@jackhansen](https://connective.celigo.com/u/jackhansen)\
**Replies:** 4\
**Last updated:** [March 5, 2026, 3:20pm UTC](https://connective.celigo.com/t/verification-failed/6098 "2026-03-05T15:20:12Z")

</div>

I’m trying to go live with a trading partner with an AS2 connection after having tested and verified in their sandbox. Though when they send me a document we are getting this error: Content-Type: multipart/report;Report…

---

## [Date Formatting issue from EDI data](https://connective.celigo.com/t/date-formatting-issue-from-edi-data/5988)

<div class="topic-metadata">

**Author:** [@jackhansen](https://connective.celigo.com/u/jackhansen)\
**Replies:** 3\
**Last updated:** [January 16, 2026, 2:34pm UTC](https://connective.celigo.com/t/date-formatting-issue-from-edi-data/5988 "2026-01-16T14:34:58Z")

</div>

I’m creating an import step from AS2 850 document to NetSuite Sales Order. I’m running into an error with the date field where it is not liking the format that is being transformed from the AS2 data. In the AS2 data the…

---

## [Can we configure the Celigo EDI parser during import to correctly handle files that use NEL (Next Line) as the row/segment delimiter?](https://connective.celigo.com/t/can-we-configure-the-celigo-edi-parser-during-import-to-correctly-handle-files-that-use-nel-next-line-as-the-row-segment-delimiter/5971)

<div class="topic-metadata">

**Author:** [@Sriram\_Ramji](https://connective.celigo.com/u/Sriram_Ramji)\
**Replies:** 3\
**Last updated:** [January 5, 2026, 5:56am UTC](https://connective.celigo.com/t/can-we-configure-the-celigo-edi-parser-during-import-to-correctly-handle-files-that-use-nel-next-line-as-the-row-segment-delimiter/5971 "2026-01-05T05:56:32Z")

</div>

I am using the Celigo EDI parser to import an X12 850 file where each segment is terminated by NEL followed by CRLF. I configured the file definition as below: "delimited": { "rowDelimiter": " \\r\\n", "colDelimi…

---

## [EDI No Error Message Error](https://connective.celigo.com/t/edi-no-error-message-error/5929)

<div class="topic-metadata">

**Author:** [@jackhansen](https://connective.celigo.com/u/jackhansen)\
**Replies:** 3\
**Last updated:** [December 11, 2025, 7:07am UTC](https://connective.celigo.com/t/edi-no-error-message-error/5929 "2025-12-11T07:07:13Z")

</div>

I’ve been setting up my first EDI flow and I’ve been able to send test documents to our partner. After some feedback I made some changes to the mappings for the document and started getting this error in Integrator: …

---

## [Changing Document in B2B Manager Dashboard](https://connective.celigo.com/t/changing-document-in-b2b-manager-dashboard/5922)

<div class="topic-metadata">

**Author:** [@jackharris](https://connective.celigo.com/u/jackharris)\
**Replies:** 2\
**Last updated:** [December 8, 2025, 7:44pm UTC](https://connective.celigo.com/t/changing-document-in-b2b-manager-dashboard/5922 "2025-12-08T19:44:35Z")

</div>

I am receiving a 940 from a trading partner. The way that it’s mapped is the W05\*03 is the Purchase Order Number This value shows up in the Doc No. field of the EDI Dashboard. In our WMS, though, we’re using t…

---

## [NetSuite EDI Integration for EDIFACT: Modernize Global B2B Transactions](https://connective.celigo.com/t/netsuite-edi-integration-for-edifact-modernize-global-b2b-transactions/5811)

<div class="topic-metadata">

**Author:** [@lauriesmith](https://connective.celigo.com/u/lauriesmith)\
**Replies:** 0\
**Last updated:** [October 28, 2025, 10:09pm UTC](https://connective.celigo.com/t/netsuite-edi-integration-for-edifact-modernize-global-b2b-transactions/5811 "2025-10-28T22:09:37Z")

</div>

Manual processing of EDIFACT-based EDI documents slows down global B2B operations and increases the risk of errors. EDI teams often juggle flat files, FTP endpoints, and custom scripts—creating bottlenecks and operationa…

---

## [Trading Partner not receiving Control Message despite Celigo showing as Accepted showing control flow run successfully](https://connective.celigo.com/t/trading-partner-not-receiving-control-message-despite-celigo-showing-as-accepted-showing-control-flow-run-successfully/5568)

<div class="topic-metadata">

**Author:** [@Ajay\_Sankar\_J](https://connective.celigo.com/u/Ajay_Sankar_J)\
**Replies:** 1\
**Last updated:** [October 6, 2025, 6:03am UTC](https://connective.celigo.com/t/trading-partner-not-receiving-control-message-despite-celigo-showing-as-accepted-showing-control-flow-run-successfully/5568 "2025-10-06T06:03:38Z")

</div>

I’m using this guide to send control messages to trading partner: Generate acknowledgment for an EDIFACT transaction – Celigo Help Center this is the data in the celigo listener coming from orders flow: { "UNB Interc…

---

## [Supplier EDI for NetSuite: Scale smarter with modern B2B integration](https://connective.celigo.com/t/supplier-edi-for-netsuite-scale-smarter-with-modern-b2b-integration/5340)

<div class="topic-metadata">

**Author:** [@timheeter](https://connective.celigo.com/u/timheeter)\
**Replies:** 0\
**Last updated:** [August 22, 2025, 6:20pm UTC](https://connective.celigo.com/t/supplier-edi-for-netsuite-scale-smarter-with-modern-b2b-integration/5340 "2025-08-22T18:20:29Z")

</div>

Many NetSuite teams struggle to scale supplier onboarding and order processing when relying on manual file transfers or rigid EDI hubs. The result? Delays, data mismatches, and a lack of visibility into PO, ASN, and invo…

---

## [Rithum EDI Integrations - Document Types](https://connective.celigo.com/t/rithum-edi-integrations-document-types/5254)

<div class="topic-metadata">

**Author:** [@Dixon\_Palatty](https://connective.celigo.com/u/Dixon_Palatty)\
**Replies:** 2\
**Last updated:** [August 15, 2025, 8:40pm UTC](https://connective.celigo.com/t/rithum-edi-integrations-document-types/5254 "2025-08-15T20:40:29Z")

</div>

Hello, We were unable to find any information on the Rithum IA regarding the list of document types it can integrate with—specifically we want to see if it can handle 820. Is there a document available that outlines all…

---

## [Getting Invalid handle error while importing B2B file using FTP](https://connective.celigo.com/t/getting-invalid-handle-error-while-importing-b2b-file-using-ftp/4895)

<div class="topic-metadata">

**Author:** [@Shamali\_Raut](https://connective.celigo.com/u/Shamali_Raut)\
**Replies:** 3\
**Last updated:** [July 15, 2025, 9:58am UTC](https://connective.celigo.com/t/getting-invalid-handle-error-while-importing-b2b-file-using-ftp/4895 "2025-07-15T09:58:35Z")

</div>

Hello, I am getting an invalid handle error while trying to import files to FTP server. While I am able to connect to FTP server by FileZilla and able to upload files as well into same folder. Even a simple CSV file is …

---

## [B2B Manager Template where the NetSuite system is on the Customer side](https://connective.celigo.com/t/b2b-manager-template-where-the-netsuite-system-is-on-the-customer-side/4860)

<div class="topic-metadata">

**Author:** [@Eric\_Mushrush](https://connective.celigo.com/u/Eric_Mushrush)\
**Replies:** 7\
**Last updated:** [July 11, 2025, 1:25pm UTC](https://connective.celigo.com/t/b2b-manager-template-where-the-netsuite-system-is-on-the-customer-side/4860 "2025-07-11T13:25:06Z")

</div>

We need to build flows in the B2B Manager where: NetSuite is sending the 850 Purchase Order and the 860 PO Change Request. We are receiving the 810 Invoice, 855 PO Acknowledgement, and 856 ASN - Ship Notice/Manifest H…

---

## [Modern EDI integration for procurement and supply chain](https://connective.celigo.com/t/modern-edi-integration-for-procurement-and-supply-chain/4888)

<div class="topic-metadata">

**Author:** [@jamesroth](https://connective.celigo.com/u/jamesroth)\
**Replies:** 0\
**Last updated:** [June 25, 2025, 5:49pm UTC](https://connective.celigo.com/t/modern-edi-integration-for-procurement-and-supply-chain/4888 "2025-06-25T17:49:30Z")

</div>

Manual procurement workflows relying on spreadsheets and outdated EDI tools often result in delays, errors, and increased costs. These inefficiencies hinder real-time visibility and scalability in supply chain operatio…

---

## [Issues parsing EDI files from FTP](https://connective.celigo.com/t/issues-parsing-edi-files-from-ftp/4777)

<div class="topic-metadata">

**Author:** [@julianeveliz](https://connective.celigo.com/u/julianeveliz)\
**Replies:** 4\
**Last updated:** [June 11, 2025, 6:22pm UTC](https://connective.celigo.com/t/issues-parsing-edi-files-from-ftp/4777 "2025-06-11T18:22:03Z")

</div>

We're having issues parsing the different files from the different partners. We're receiving all the files in the same path and can't identify which file is for "X" TP, since all the files are in the same folder. When th…

---

## [AS2 Decryption failed](https://connective.celigo.com/t/as2-decryption-failed/4504)

<div class="topic-metadata">

**Author:** [@azizayoujil](https://connective.celigo.com/u/azizayoujil)\
**Replies:** 2\
**Last updated:** [May 19, 2025, 8:27pm UTC](https://connective.celigo.com/t/as2-decryption-failed/4504 "2025-05-19T20:27:49Z")

</div>

Hi Team. I am currently setting up an AS2 communication , and I am encountering an issue while transmitting EDI messages through the system. Here is a detailed explanation of the issue: When I send an EDI message witho…

---

## [EDI Generator for muliple input records (multiple records in 1 page)](https://connective.celigo.com/t/edi-generator-for-muliple-input-records-multiple-records-in-1-page/4542)

<div class="topic-metadata">

**Author:** [@sujitdesai](https://connective.celigo.com/u/sujitdesai)\
**Replies:** 1\
**Last updated:** [May 14, 2025, 10:51am UTC](https://connective.celigo.com/t/edi-generator-for-muliple-input-records-multiple-records-in-1-page/4542 "2025-05-14T10:51:52Z")

</div>

I am exporting Invoices (Saved Search Main Line = FALSE, grouped rows = TRUE) to an FTP as EDI 810 (x12). I have set up the FTP with EDI file definition, and parser correctly (I replaced the default mapping for all the …

---

## [Celigo B2B Manager - EDI File with multiple transactions](https://connective.celigo.com/t/celigo-b2b-manager-edi-file-with-multiple-transactions/4432)

<div class="topic-metadata">

**Author:** [@julianeveliz](https://connective.celigo.com/u/julianeveliz)\
**Replies:** 5\
**Last updated:** [April 30, 2025, 9:15pm UTC](https://connective.celigo.com/t/celigo-b2b-manager-edi-file-with-multiple-transactions/4432 "2025-04-30T21:15:56Z")

</div>

Hello. We’re trying to configure EDI rules to capture multiple transactions from a single 850 file, but we’re receiving errors when following the steps in this Celigo article. We’re not sure what’s wrong with the rules …

---

## [Legacy to B2B Manager Conversion](https://connective.celigo.com/t/legacy-to-b2b-manager-conversion/3117)

<div class="topic-metadata">

**Author:** [@jackharris](https://connective.celigo.com/u/jackharris)\
**Replies:** 19\
**Last updated:** [April 28, 2025, 1:09pm UTC](https://connective.celigo.com/t/legacy-to-b2b-manager-conversion/3117 "2025-04-28T13:09:54Z")

</div>

So, I just got B2B Manager and I'm working to get my flows to show up on the EDI Activity dashboard. I've been unsuccessful so far and wanted to know if anyone else has had a similar hurdle and how they got over it.

---

## [ANSI X12 EDI 856 Advance Ship Notice HL structure building](https://connective.celigo.com/t/ansi-x12-edi-856-advance-ship-notice-hl-structure-building/1025)

<div class="topic-metadata">

**Author:** [@paultopham](https://connective.celigo.com/u/paultopham)\
**Replies:** 5\
**Last updated:** [October 2, 2024, 8:26pm UTC](https://connective.celigo.com/t/ansi-x12-edi-856-advance-ship-notice-hl-structure-building/1025 "2024-10-02T20:26:49Z")

</div>

Anyone using Celigo for X12 EDI? In the sample below, there are 4 different Hierarchical Levels represented Two things I need to do when mapping these segments. Establish and maintain a counter throughout a Shipment …
